Industry Projection Methodology
Current publication status: PTC has not released a validated numerical Industry Projections forecast. Research categories and release criteria are described below; none implies that a backtested model is currently available.
Published Industry Estimates are modelled assessments of a recorded period. Industry Projections would concern future periods and therefore require separate forecasting methods, documented uncertainty and additional approval.Read published estimates.
1. Published evidence before extrapolation
- Use a dated, publication-gated PTC baseline rather than live mutable estimate rows.
- Specify the exact market universe, asset scope, source coverage and model versions.
- Preserve earlier baseline values and any methodology breaks without silent restatement.
- Separate observed activity, modelled estimates and unverified hypotheses.
2. Scenarios are not forecasts
The Industry Projections landing page includes an illustrative scenario tool using independent annual percentage assumptions entered by the reader. A zero-rate default is mathematical flatlining, not the PTC base case. The tool compounds a published starting figure according to the formula:
Scenario value = baseline × (1 + annual rate)months / 12.
Outputs are calculated in the user's browser. They are not PTC predictions, model probabilities, measured growth, confidence bands, investment advice or new published research values. The monthly payout result is a monthly run-rate at the illustrated point in time, not the sum of projected payouts over the horizon. The tool does not model firms entering or leaving, payout rules, risks, pricing, regulation or changes in methodology.
3. Basic assumption consistency checks
The scenario explorer flags any case where an illustrative funded-trader count exceeds the illustrative active-trader count, because that may conflict with a funded-as-subset-of-active interpretation. It also flags user assumptions that shift either the funded-to-active share or the monthly payout run-rate per funded trader to less than half or more than twice the corresponding published-baseline relationship.
These are transparent, indicative arithmetic checks, notstatistically calibrated thresholds, confidence intervals, validated projections or automatic corrections. The user's assumptions remain unchanged; warnings appear beside the illustrated outputs.
4. Requirements for a future published projection
- Defined question: Specify a measurable target, time horizon and eligible universe.
- Comparable history: Document whether historical snapshots can be compared despite model-version and cohort changes.
- Out-of-sample testing: Evaluate past-origin predictions on later held-out periods without forward-looking leakage.
- Uncertainty: Disclose prediction intervals, key assumptions and failure conditions supported by validation evidence.
- Method version: Record inputs, parameters, baseline date, validation window and model identifier.
- Publication approval: Require a dated human research review and explicit release status before any numeric projection becomes public.
5. Historical vintage comparability — October 2026 audit
The two published monthly baseline periods currently available are 2 September and 1 October 2026. September uses v2 Active Trader, Funded Trader and Monthly Payout models for 213 modelled firms. October uses Firm Scale v3 versions for 207 modelled firms. The published model-eligibility counts also differ. September publishes Forex and Futures aggregates; the October baseline has combined aggregates only. No firm-by-firm membership bridge or comparable vintage re-estimation has been approved.
Therefore, the observed numerical difference between the two published aggregates is not an audited monthly growth rate, and PTC does not derive a compounded future projection from that difference. The public archive preserves the original values and methodology identifiers.Review the published-vintage audit.
Before time-series forecasting can begin, the research process must:
- Reconcile firm identities and in-scope cohort membership without publishing private firm-level research data.
- Define a versioned comparability bridge or rebuild a separate historically consistent analytical series, without overwriting original published numbers.
- Document missing universe splits, date alignment, model eligibility and source/coverage changes.
- Accumulate enough comparable observations for held-out evaluation and assess forecast errors, not merely in-sample fit.
- Obtain explicit methodology and editorial approval before releasing public growth rates or forecasts.
A future projection release should publish change logs and distinguish revised forecasts from errors corrected in a previously published baseline. Locked, draft and research-only values are not eligible for public release.
6. Research-track boundaries
The planned tracks cover market scale, industry outlook, country growth and firm trajectories. Each requires its own validation and may remain unpublished if sufficient historical coverage or calibration is unavailable. PTC will not fill unsupported horizons or jurisdictions with fabricated numbers.
